Every apartment building we price in Connecticut now has EV charging somewhere in the scope, and the first question from the owner or developer is usually the same one: should we put in fast chargers? The short answer is almost never, and the reason has nothing to do with the chargers themselves. It has to do with how people charge at home, and what each type of charger asks of the building’s electrical service.

1. What the two charger types actually are

Level 2 charging is 208 or 240 volt AC. A typical commercial Level 2 charger draws 32 to 48 amps and adds 20 to 35 miles of range per hour. The car’s own onboard charger converts AC to DC, which is why the equipment on the wall is relatively simple and relatively inexpensive.

DC fast charging bypasses the car’s onboard charger and delivers DC directly to the battery. Units run from 50 kW to 350 kW, and a mid-range 150 kW unit needs a 480 volt, three-phase feed at roughly 200 amps. One fast charger can draw as much power as 10 to 15 Level 2 ports running at once. It charges a car in 20 to 40 minutes instead of overnight.

2. How tenants charge at home

A resident with an EV plugs in when they get home and unplugs in the morning. That is eight to twelve hours of dwell time, and a Level 2 port fills any battery on the market in that window. Fast charging solves a problem apartment residents do not have: needing a full charge in half an hour. It is the right tool for a highway rest stop, a fleet depot or a retail site where drivers stay for an hour and leave. At an apartment building, a fast charger sits idle most of the day and competes with the building’s own peak load in the evening.

3. What each does to the electrical service

This is where the decision gets made. A 150-unit building might have a 2,000 or 2,500 amp service at 208Y/120 volts. Ten Level 2 ports with load management, as we describe in EV-ready apartment parking, can usually be carried on the existing service with a dedicated panel and some headroom planning. A single 150 kW fast charger needs its own 480 volt service or a step-up transformer, a separate utility application and, in many cases, a new pad-mounted transformer from the utility. The fast charger’s demand charges on the electric bill can also exceed its revenue unless it is heavily used.

Put differently: the cost of one fast charger, including the service work, is usually more than the cost of 20 Level 2 ports, and it serves fewer residents.

4. When DC fast charging does make sense

There are three situations where we would recommend it on a multifamily or mixed-use property. First, a mixed-use building with ground-floor retail where the parking is public and short-stay; the fast charger serves the retail customers, not the residents. Second, a large campus or garage where a fast charger is a shared amenity for residents without assigned parking, backed by a bank of Level 2 ports for everyone else. Third, a site where the utility is already bringing in 480 volt service for other reasons, such as a central plant or large elevators, and the incremental cost is modest.

5. Planning the Level 2 layout

For most Connecticut apartment buildings the right plan is a Level 2 installation sized for today’s demand with conduit and panel capacity for tomorrow’s. We typically recommend installing ports for 5 to 10 percent of spaces at opening, with raceway and panel space roughed in for 20 percent or more. The conduit is cheap during construction and expensive after the slab is poured. Networked chargers with load management let the building add ports later without touching the service, and let the owner bill residents for the electricity they use.

Placement matters too: cluster the ports near the panel to shorten feeders, keep them out of the lowest point of a garage where water collects, and reserve at least one accessible space with the extra clearance an accessible charging space needs.

The decision in one sentence

Residents need chargers that fill a car overnight, not chargers that fill a car at lunch. Level 2, planned with room to grow, is the answer for nearly every apartment building; DC fast charging belongs on the retail side of a mixed-use project or as a single shared amenity on a large campus.

Sunderland Electric designs and installs EV charging and site power for multifamily, mixed-use and commercial properties across Connecticut. Send us your drawings and we will size the charging plan to the service you have.

Have a multifamily project to price?

Send us your drawings and specs, or call the office at 203-936-9585.