Emergency vs. Standby Generators for Apartment Buildings: What Code Requires and What Owners Choose

·

Sunderland Electric

55 Elm Street historic office building converted to apartments, Hartford CT

“Do we need a generator?” is one of the first questions on a multifamily project, and the honest answer is that the building code decides part of it and the owner decides the rest. The two parts have very different costs, and mixing them up is how projects end up with a generator that is either too small for what the code requires or far larger than the business plan ever needed.

1. Three categories, not one

The National Electrical Code, which Connecticut adopts through the State Building Code, sorts backup power into three categories. Emergency systems (NEC Article 700) are the loads that keep people alive and let them get out: egress lighting, exit signs and fire alarm. Legally required standby systems (Article 701) are loads the code or the fire marshal requires but which are not immediately life-threatening if they fail, such as a fire pump or smoke control in a high-rise. Optional standby (Article 702) is everything the owner simply wants to keep running: elevators for convenience, the leasing office, a resident lounge, heat in the lobby.

Each category has its own rules for how quickly power must be restored, how the wiring is separated from the normal building wiring, and how the system is tested and maintained. Emergency loads are the strictest; optional standby is the most flexible.

2. What a typical Connecticut apartment building must have

For a mid-rise wood-frame or podium building of four to six stories, the required emergency loads are small: egress and stair lighting, exit signs, the fire alarm panel and sometimes emergency communication. Those loads are often a few kilowatts in total, and the code allows them to be served by battery backup, either individual battery units in the fixtures or a central inverter, instead of a generator. Many Connecticut apartment buildings have no generator at all for this reason, and that is fully code-compliant.

The picture changes once the building is tall enough to be a high-rise, has a fire pump, or has an elevator that must operate during a fire for firefighter access or accessible egress. At that point the code calls for a standby power source that can carry those loads for a defined period, and a generator becomes the practical answer. The engineer of record determines which loads fall into which category; our job is to build the system so the categories stay separate and the transfer equipment performs as designed.

3. What owners choose to add, and why

Once a generator is on site, the marginal cost of adding optional standby loads is mostly the size of the generator and a second transfer switch. Owners commonly add elevators (so residents are not stranded on upper floors during a storm), domestic water booster pumps, the building’s heating plant, the leasing office and a resident amenity space. In a building marketed to older residents or with a large share of work-from-home tenants, a generator that keeps elevators and corridors running during the next multi-day outage is a leasing advantage that can be worth more than its cost.

What owners generally should not do is try to put the whole building on standby. Backing up every apartment means a generator sized to the full service, a very large fuel supply and an electric bill that reflects it. A targeted optional standby scope is the sweet spot.

4. Fuel, location and the things that get missed

Natural gas generators are the default on most of our projects because they avoid the fuel-storage and refueling issues of diesel, though diesel is still specified where the code requires on-site fuel for a set number of hours. The generator location drives a surprising amount of cost: a rooftop unit needs a crane and structural review, a grade-level pad needs clearances from windows, doors and air intakes, and either one needs a sound and exhaust plan the neighbors will accept. Run the generator pad and the transfer-switch room through the design early, not after the building footprint is fixed.

The other common miss is the transfer switch count. Emergency loads need their own transfer switch; optional loads cannot share it. We wrote about keeping that equipment tested in why a backup generator needs a transfer switch.

5. Getting the scope right in the bid

When a bid package says only “generator, 150 kW” without a load schedule and a list of what sits behind each transfer switch, every bidder prices a different system. Ask the engineer for the emergency, legally required and optional load lists, the required run time, the fuel type and the location. With those five items, an electrical contractor can price the system accurately and tell you what adding or removing an optional load would do to the number. Our electrical bid package checklist covers what else belongs in that package.

Sunderland Electric installs generators, transfer switches and life-safety power systems on apartment and mixed-use buildings across Connecticut. Send us the drawings and we will price the backup power scope with the load categories broken out.